Asbestos Removal London Case Study – Community Centres

Client: Ayerst Environmental Ltd

Location: Community Centre, London W6

Contractor: Deconstruct UK Ltd

Completion Date: April 2011

Sector: Public Buildings

Decontamination of asbestos from a boiler house in the local community centre.

Asbestos Removal London Case Study – Community CentresAsbestos Removal London Case Study – Community Centres

About the Project:

The calorifier vessels and pipework within the boiler room had been subjected to damage over the years and an effective repair was necessary. The damaged pipework was cleaned using h-type vacuum cleaners and ‘tac’ rags before being repaired using calico wrap and elastomeric paint. The boiler house was thoroughly decontaminated and the timber enclosure to the calorifiers was made good.

Project Challenges:

This project was undertaken adjacent to a live Community Centre that was in constant use, so it was imperative that our operatives carried out the works as discretely as possible and conducted themselves professionally at all times. The access to the working area was directly off the public highway, so a secure timber hoarding had to be erected around the entrance to the boiler room. An operative was stationed outside the entrance to the enclosure at all times, during working hours, to ensure that no unauthorised people entered the work area.

Download the asbestos removal case study for community centres here

Our Services:
Deconstruction Services
Demolition Services
Enabling Works
Asbestos Removal Servicestick
Ground Works Services
Piling Services
Steelwork Installations
Builders Works
Emergency Dangerous Structures
Temporary Works
Asbestos Surveying

For further information on our Asbestos Removal and Deconstruction services, please email enquiries@deconstructuk.com or call us now on 020 7734 6655

Read more http://feedproxy.google.com/~r/DeconstructAsbestosRemoval/~3/90b38rqvu80/